210 official records · 6/6 sources healthy · collected Nov 17, 2026, 02:38 UTC
EXOJURISSpace law and policy, connected
Sign in
FCC · United States · Proposed rule

In the Matter of Upper C-band (3.98-4.2 GHz)

Exojuris Desk · automated factual notice from Federal Register: FCC space and satellite documents · added to Exojuris Nov 17, 2026, 02:13 UTC · updated Nov 17, 2026, 02:34 UTC (v2)
Follow this proceeding

FCC proposed rule published December 5, 2025 at 90 FR 56076.

Summary in the document (agency text, quoted)
In this Notice of Proposed Rulemaking (NPRM), the Federal Communications Commission (Commission) seeks comment on proposed rule changes that would expand the ecosystem for next generation wireless services in the 3.7-4.2 GHz band (C-band) by making as much as 180, and at least 100, megahertz of the 3.98-4.2 GHz band (Upper C-band) available for terrestrial wireless flexible use via a system of competitive bidding. This action would be in furtherance of Congress' direction in the One Big Beautiful Bill Act (OBBB Act) to "complet[e] a system of competitive bidding not later than 2 years after the date of enactment of this Act for not less than 100 megahertz in the band between 3.98 gigahertz and 4.2 gigahertz." The NPRM seeks comment on options for reconfiguring the Upper C-band in the contiguous United States ranging from 180 megahertz (3.98-4.16 GHz) to the congressionally mandated minimum of 100 megahertz (3.98-4.08 GHz) for terrestrial wireless use. The NPRM seeks comment on how much Upper C- band spectrum--beyond the minimum 100 megahertz required by the OBBB Act--could be repurposed by incumbent fixed satellite service (FSS) space station operators and on how the transition could be effectuated if their existing customers relocate out of the C-band. Under any of the reconfiguration options under consideration, the NPRM's baseline proposition is to apply the existing 3.7 GHz Service rules (applicable in the Lower C-band from 3.7-3.98 GHz) to any newly authorized terrestrial wireless operations. Any other rules and requirements, including those relating to the transition process, would be modeled to the greatest extent possible on those that applied to the Lower C-band transition. The NPRM also seeks comment on a range of issues associated with repurposing some portion of the Upper C-band, including: reallocation of the 4.0-4.2 GHz band; competitive bidding procedures for an eventual auction; licensing, operating, and technical rules for any new wireless services; (4) transitioning incumbent FSS operations; and promoting co-existence with adjacent band radio altimeters.

What the source states

each value links to its evidence
Document type
Proposed rule
evidence · supported
Official API field · api:typeCaptured Nov 17, 2026, 02:31 UTC · source version 2
Action
Proposed rule.
evidence · supported
Official API field · api:actionCaptured Nov 17, 2026, 02:31 UTC · source version 2
Published
December 5, 2025
evidence · supported
Official API field · api:publication_dateCaptured Nov 17, 2026, 02:31 UTC · source version 2
Citation
90 FR 56076
evidence · supported
Official API field · api:citationCaptured Nov 17, 2026, 02:31 UTC · source version 2
Docket and document IDs
GN Docket No. 25-59; FCC 25-78; FR ID 319865
evidence · supported
Official API field · api:docket_ids[0]Captured Nov 17, 2026, 02:31 UTC · source version 2
Reply comments due (as stated)
February 3, 2026
evidence · supported
Parsed from the document text by a fixed rule · api:dates[46]
“reply comments are due on or before February 3, 2026”
Captured Nov 17, 2026, 02:31 UTC · source version 2
Original source

In the Matter of Upper C-band (3.98-4.2 GHz)

Source
Federal Register: FCC space and satellite documents
Identifier
2025-22020
Class
Proposed rule
First captured
Nov 17, 2026, 02:11 UTC
Versions
v1 Nov 17, 2026, 02:11 UTC · v2 Nov 17, 2026, 02:31 UTC (Re-extracted with federal-register@1.1.0; the source content is unchanged)

Proceeding history

GN Docket No. 25-59 →
  1. Dec 5, 2025Published
    Proposed rule (Proposed rule) published in the Federal Register, 90 FR 56076: In the Matter of Upper C-band (3.98-4.2 GHz)
    Recorded Nov 17, 2026, 02:11 UTC · historical import · source document ↗
  2. Jan 5, 2026Date withdrawn
    Exojuris withdrew the comment date 2026-01-05: not stated in the document on re-reading (the source did not change)
    Recorded Nov 17, 2026, 02:31 UTC · historical import · source document ↗
  3. Jul 31, 2026Published
    Final rule (Final rule) published in the Federal Register, 91 FR 48700: Upper C-Band (3.98-4.2 GHz); Expanding Flexible Use of the 3.7 to 4.2 GHz Band
    Recorded Nov 17, 2026, 02:11 UTC · historical import · source document ↗
  4. Sep 29, 2026Effective date (stated)
    Effective date stated in 91 FR 48700
    Recorded Nov 17, 2026, 02:11 UTC · historical import · source document ↗
  5. Oct 19, 2026Published
    Notice (Notice; solicitation of comment) published in the Federal Register, 91 FR 66139: Wireless Telecommunications Bureau Seeks Comment on Preliminary Cost Catalog for Upper C-Band Incumbent Transition
    Recorded Nov 17, 2026, 02:11 UTC · historical import · source document ↗
  6. Oct 19, 2026Effective date (stated)
    Effective date stated in 91 FR 66010
    Recorded Nov 17, 2026, 02:11 UTC · historical import · source document ↗
  7. Oct 19, 2026Published
    Final rule (Final rule; announcement of effective date) published in the Federal Register, 91 FR 66010: Upper C-Band (3.98-4.2 GHz); Expanding Flexible Use of the 3.7 to 4.2 GHz Band
    Recorded Nov 17, 2026, 02:11 UTC · historical import · source document ↗
  8. Oct 26, 2026Published
    Notice (Notice; solicitation of comments) published in the Federal Register, 91 FR 67314: Wireless Telecommunications Bureau Establishes a New Docket and the Process for Comment on Eligible Space Station Operator Transition Plans
    Recorded Nov 17, 2026, 02:11 UTC · historical import · source document ↗
  9. Oct 26, 2026Published
    Notice (Notice) published in the Federal Register, 91 FR 67313: Wireless Telecommunications Bureau Announces Upper C-Band Clearinghouse Selection Criteria and Submission Process
    Recorded Nov 17, 2026, 02:11 UTC · historical import · source document ↗
  10. Oct 29, 2026Effective date (stated)
    Effective date stated in 91 FR 68055
    Recorded Nov 17, 2026, 02:11 UTC · historical import · source document ↗
  11. Oct 29, 2026Published
    Final rule (Final rule; announcement of effective date) published in the Federal Register, 91 FR 68055: Upper C-Band (3.98-4.2 GHz); Expanding Flexible Use of the 3.7 to 4.2 GHz Band
    Recorded Nov 17, 2026, 02:11 UTC · historical import · source document ↗
100%